HTM 03-01 CRITICAL VENTILATION SYSTEM VERIFICATION

Fact: Over 1875 critical ventilations verified annually

Ventilation systems serving ‘critical care areas’ should be inspected quarterly and their performance measured and verified annually. The quarterly inspection can be a simple visual check but the annual verification will be more detailed and include measurement of the system’s actual performance.

All our verifications and tests are carried out in accordance with HTM 03-01 (relating to HTM 2025 if necessary) and all relevant HTMs, Health & Safety at Work Act 1974, The Control of Substances Hazardous to Health (COSHH) Regulations 2002, Health Building Note (HBN) 04-01, EGGMP (Orange guide), European guidelines on good manufacturing practice (GMP) published by the Medicines and Healthcare products Regulatory Agency (MHRA), ISO (the International Organization for Standardisation) 14644

Our engineers are expertly trained to BTEC Level 3 / City & Guilds Authorised Person HVAC (HTM 03) and have vast experience in testing all different types of operating theatres including ultra-clean operating theatres, minor procedures rooms, hospital wards, sterile service departments including IAP rooms, aseptic suites, isolation rooms, mortuaries, pharmacies and category 2 and 3 laboratories. All instruments used in testing are calibrated to national standards and copies of certification are supplied with reports

Our critical ventilation system verification service includes:

  • Supply and extract air change rates

  • Room pressure differentials

  • Light level test

  • Sound level test

  • Room schematic

  • Duct traverse reading

  • HTM 03-01 AHU inspection

  • HTM 03-01 suite inspection

  • Particle counts if requested/where applicable

  • Filter integrity testing (DOP) of HEPA filters fitted (supply/extract or UCV canopy)

  • UCV preliminary checks

  • UCV 2 metre and 1 metre readings

  • Full written report with conclusions and recommendations

  • Remedial work based upon the report can be undertaken

Our collaborative and proactive approach drives efficiency, cost savings and offers our clients peace of mind. We are committed to continuous improvement, through innovation and investment in our personnel, methodologies and equipment.

We offer extremely competitive rates and daytime or evenings to offer minimal disturbance to our customers

  • Operating theatres of any type, including rooms used for interventional investigations (eg catheter laboratories)
  • Patient isolation facility of any type
  • Critical care, intensive treatment or high-dependency unit
  • Neonatal unit
  • Category 3 or 4 laboratory or room
  • Pharmacy aseptic suite
  • Inspection and packing room in a sterile services department
  • MRI, CAT and other types of emerging imaging technologies that require particularly stable environmental conditions to remain within calibration
  • Any system classified as a lev system under the COSHH regulations
  • Any other system that clearly meets the definition
  • The system is still required
  • The AHU conforms to the minimum standard
  • The fire containment has not been breached
  • The general condition of the ventilation system is adequate
  • The fabric of the area served is satisfactory
  • The system performance is adequate with respect to the functional requirement – this will require:

    – A full measure of the supply and extract air-flow rates
    – The calculation of room air-change rates if applicable
    – The measurement of room differential pressures if applicable
    – The measurement of room noise levels
    – Air-quality checks if appropriate
    – A check on the control functions

    An assessment should then be made as to whether the system overall is fit for purpose and operating in a satisfactory manner

MORE SERVICES

LATEST NEWS

OFFICE HOURS

Monday – Friday 08:00 – 17:00

CONTACT

RJ Urmson Commissioning Engineers Ltd
Kellett Street Works
Fellery Street
Chorley
PR7 1EL

T: 01257 262 683
E: sales@rjurmson.com

Free Quote
Contact Us

FREE QUOTE

Do you need help with Critical Ventilation Systems Verifications? Fill out this form to get in touch.

Do you have previous reports available?
YesNo

Do you have ventilation drawings available?
YesNo

When would you like the work to be carried out?
Working hoursOut of hours / EveningsWeekends

Do you have previous reports available?
YesNo

Do you have ventilation drawings available?
YesNo

When would you like the work to be carried out?
Working hoursOut of hours / EveningsWeekends

RJ URMSON GROUP ACCREDITATIONS