All newly installed closed systems, LTHW / LPHW, MTHW, HTHW; chilled water and condenser water circuits should be pre-commission cleaned in line with BSRIA BG 29/2012. The use of a chemical enhances the cleaning process by removing soluble contaminants, installation debris, corrosion, scale and biological fouling.
Following pre-commission cleaning it is important that closed systems are carefully monitored and regularly maintained. This maintenance should continue throughout the life of the building and involve implementing a monitoring and maintenance regime. Our engineers are fully trained and experienced in all aspects and phases of the pre commission chemical cleaning treatment process.

Our engineers are not only fully trained in carrying out pre commission chemical cleaning treatments, but also in ensuring the safety of everyone whilst cleaning is carried out. All engineers carry the CSCS passport to safety and are all enhanced DBS checked to ensure confidence when working on site and in areas with vulnerable people.
Our pre commission chemical cleaning treatment to BSRIA BG 29/2012 service includes:
Our collaborative and proactive approach drives efficiency, cost savings and offers our clients peace of mind. We are committed to continuous improvement, through innovation and investment in our personnel, methodologies and equipment.
We offer extremely competitive rates and daytime, evenings or weekends to offer minimal disturbance to our customers.